End-to-End Waste Collection Service Verification & Fleet Operations System

Built for waste haulers and back-office operations, FTS offers a single integrated system that combines hardware, multi-angle cameras, fleet operations software, and AI-powered insights.

Reduce costs and optimize efficiency with PTO lift-engagement verification, vehicle health monitoring, roll-off container dwell-time tracking, and more.

Book a demo
*Hopper Camera - Available for front- or side-loading collection vehicles. *Pedestrain Alerts - Requires FleetCam 360 system, which performs AI pedestrian detection with audiovisual warnings.

Trusted by Industry Leading Waste Management Companies Trusted by Industry Leading Waste Management Companies

Improve safety and driver accountability with up to eight separate cameras capturing HD footage from around your vehicle.

Waste alerts
Positive Service Verification

Positive Service Verification

Ensure positive service verification by integrating vehicle camera systems, detailed breadcrumb trails, and precise GPS tracking.

Improve Safety and Training

Improve Safety and Training

Prioritize driver safety and training with vehicle cameras, AI event detection, in-cab audiovisual alerts, and driver self-coaching.

Optimize Collection Routes

Optimize Collection Routes

Improve efficiency, reduce fuel costs, and ensure accurate pickups, deliveries, and returns with route optimization software.

Integrate with Existing Equipment

Integrate with Existing Equipment

Seamlessly integrate with your existing third-party cameras to capture video telematics data without new hardware installation.

Features

Resolve Customer Disputes with Positive Service Verification

Set triggers and alerts to monitor and report on PTO activities, such as side-loader and compactor operation, and confirm collections are completed accurately and on time. Using advanced vehicle camera systems and precise GPS tracking, capture video footage and comprehensive activity tracking data to create a detailed breadcrumb trail. Use snapshot images to resolve customer disputes quickly and effectively, and demonstrate a high level of service reliability and accountability to your customers.

More about GPS Tracking>
Real Time Location Tracking
Hopper cameras use AI to detect contamination and overloaded bins.

Reduce Costs with AI Contamination Detection

Recover additional costs with AI-driven hopper cameras that detect overflowing bins and container contamination. Advanced AI detection provides service verification of contaminated or overloaded bins and dumpsters, connecting the video evidence to specific GPS locations so you can assess additional fees to the correct customers.

Increase Visibility with Advanced Camera Systems

Gain total visibility of your drivers and the road around them from up to 8 camera angles, including hopper cams for contamination monitoring and 45-degree angle backup cams for safe alley navigation. Remotely access the vehicle's camera feed in real-time or view any moment of stored historical footage without having to physically access the vehicle cameras.

More about vehicle camera systems >

Surround View Bird's Eye View

Reduce Blind Spots with FleetCam 360

Give your drivers a 360° view of their vehicle's surroundings with FleetCam 360. Minimize blind spots by merging four camera views into a seamless bird's-eye view of the vehicle and its surroundings displayed on an in-cab LCD. Advanced AI detects pedestrians within the 360° danger zone, as well as vehicles approaching from behind and unsafe lane changes.

More about FleetCam 360 >

Plug & Play with Your Existing Cameras

Gain new functionality without complex equipment replacements. Integrate your existing hardware, such as 3rd Eye1 cameras, by simply plugging your current vehicle cameras into an FTS MDVR to live stream, review historical video, and more with the IntelliHub fleet management platform.

1. 3rd Eye is a registered trademark of The Heil Co.

Plug into MDVR to integrate existing cameras.

Quickly Optimize Collection Routes to Improve Efficiency

Build efficient, cost-effective routes to improve efficiency and reduce fuel costs with route optimization software. Visualize route paths on an interactive map with a simple drag-and-drop interface with route total summaries that automatically recalculate to show the impact of adding/removing stops. Ensure assets are fully utilized by quickly viewing pending and completed stops. Keep your customers satisfied with accurate pickups, deliveries, and returns to improve customer satisfaction.

More about route optimization >

More Waste Management Fleet Solutions More Waste Management Fleet Solutions

1. 3rd Eye is a registered trademark of The Heil Co.

Ready to make fleet management more manageable?